NITETIME GOPHER 1.0 - Lake Koshkonong Node
Server: gopher.nitetime.net:70    Selector: /archive/mechanical-minds/history/cold-storage/mud-floods-chicago-seattle.txt
MUD FLOODS: CHICAGO, SEATTLE AND THE RAISED STREET

Some photographs really do show windows below the present street level.
Some doors really do open below current grade. Some streets really did
change elevation. Some buildings really were lifted, moved, remodeled or
surrounded by new fill.

The photograph can be genuine while the caption is wrong.

CHICAGO

Chicago is an unusually good case because the city documented its drainage
problem and its response. The early city occupied low, wet ground. Sewers
needed enough slope to work. Beginning in the 1850s, Chicago undertook a
long program of raising street grades. Buildings were lifted with jackscrews
so new foundations and street levels could be built beneath them.

This is not a theory inferred from one basement window. The Encyclopedia of
Chicago describes the decades-long street-raising project, and the Library
of Congress Historic American Buildings Survey records the 1869 Water Tower
and the changing shoreline and land fill around it. The engineering history
of Ellis Chesbrough explains why the city had to alter its grade as part of
its sewer and water program.

INTERNET:
"Why is the original first floor underground?"

CHICAGO, 1860:
"We raised the goddamn street."

That is a Nitetime summary, not a complete engineering report. The report is
the important part.

SEATTLE

Seattle supplies a different but related example. The Denny Regrade leveled
part of Denny Hill in stages beginning in the late 1890s and continuing into
the early 20th century. The Seattle Municipal Archives describes regrading,
filling tidal flats and building infrastructure to make a steep, water-
bounded city more usable for commerce and transport. Its finding aid points
to photograph albums showing the work, including water cannons sluicing the
hill away.

OTHER POSSIBILITIES

A below-grade opening can also result from road resurfacing, sidewalk
reconstruction, retaining walls, landfill, flood control, local excavation,
subsidence, an original basement design, a changed entrance or a later
addition. One explanation does not fit every photograph.

THE METHOD

Identify the building.
Identify the street.
Identify the date.
Find the original grade.
Search city engineering records, newspapers, maps, permits and photographs.
Ask whether the building was raised or the street was raised.

A window below today's grade tells us about the relationship between a
building and today's grade. By itself it does not tell us when or why that
relationship changed.

SOURCE:
Encyclopedia of Chicago, Street Raising on Lake Street
https://www.encyclopedia.chicagohistory.org/pages/3292.html

SOURCE:
Encyclopedia of Chicago, Multicentered Chicago
https://www.encyclopedia.chicagohistory.org/pages/854.html

SOURCE:
Ellis Sylvester Chesbrough, ASCE historical profile
https://www.asce.org/about-civil-engineering/history-and-heritage/notable-civil-engineers/ellis-sylvester-chesbrough/

SOURCE:
Seattle Municipal Archives, A City at Work
https://www.seattle.gov/city-archives/exhibits-and-education/online-exhibits/a-city-at-work

SOURCE:
Denny Hill Regrade Photograph Albums
https://archives.seattle.gov/finding-aids/repositories/2/resources/451
SIGNAL ACTIVE   //   WISCO 608   //   Gateway locked to gopher.nitetime.net